Areas of expertise include civil, structural, mechanical and
electrical engineering. All work performed by professional
engineers and/or registered roofing consultants with a minimum of
five years of experience. Projects include on-site investigation,
data capture and photo documentation. Investigation results,
including a summary of conclusions, are delivered in report
format.* Typical1 turnaround
time is 15 days or less from project acknowledgement.
Areas of expertise include residential, commercial/large loss and
vehicle fires. All work performed by certified fire investigators
with a minimum of five years of experience. Projects include
on-site investigation, data capture and photo documentation.
Investigation results, including a summary of conclusions, are
delivered in report format.* All investigations and reports meet
or exceed the standards set by NFPA 921. Typical1 response time to the scene is 48
hours or less. Typical1
turnaround time is 15 days or less.
Frequently tested items include household appliances (i.e. water
heaters, dryers, etc.) and plumbing components like supply lines.
All work performed by engineers or PhDs at the Donan Component
Testing Laboratory. Projects include damage/failure analysis,
data capture and photo documentation. Investigation results,
including identification of failure mode and evaluation of
subrogation potential, are delivered in report format.* 1Typical turnaround time is 15 days
or less from date the item is received at our laboratory facility
in Louisville, KY.